Sohar Aluminium was built by international engineering giant Bechtel in 2008/2009. Gantrex is proud to have supplied the rail system and tieback assemblies for the entire project, totalling over 7,000m of rail pad, 25,000 clips and 750 full tieback assemblies. The project was valued at approximately 1.5 mio USD.
contact us
Back to References
Sohar Aluminium, Oman
2022/04/15
Uncategorized