In this APM Terminal in Turkey, Gantrex has supplied the rail systems for both Phase 1 and Phase 2. The project included over 1,400m of rail A120 in a high steel grade, including the entire fixing system.
contact us
Back to References
Petlim Container Terminal, Izmir, Turkey
2022/04/15
Uncategorized