Gantrex supplied a total of 1400m of rail A150 and full RailLok accessories for the development of the Saudi Global Ports project in Dammam. Material has been supplied by end of 2013 and installation was executed in 2014. For this project, Gantrex worked together closely with China Harbour Engineering (CHEC) and the global port operator PSA.
contact us
Back to References
King Abdulaziz Port (Terminal 2), Saudi Arabia
2022/04/15
Uncategorized