All KICT cranes, operated by international terminal operator HPH, are running on rail tracks supplied and installed by Gantrex. in 2007, Gantrex supplied the first system to KICT, which included a 1,000m long rail track. The civil works were executed by China Harbour Engineering Company (CHEC) and the rails were installed fully by Gantrex rail installation specialists.
contact us
Back to References
Karachi International Container Terminal (KICT), Pakistan
2022/04/15
Uncategorized